This page was exported from Top Exam Collection [ http://blog.topexamcollection.com ] Export date:Sun Jan 19 5:08:00 2025 / +0000 GMT ___________________________________________________ Title: 2022 Realistic C_TS413_1909 Dumps Latest SAP Practice Tests Dumps [Q77-Q99] --------------------------------------------------- 2022 Realistic C_TS413_1909 Dumps Latest SAP Practice Tests Dumps C_TS413_1909 Dumps PDF - C_TS413_1909 Real Exam Questions Answers NO.77 Which prerequiste do you require for SAP Asset manger? choose 2 answers  mobile add-on for S/4hana  SAP cloud platform  SAP mobile platform  mobile add-on for SAP ERP NO.78 With SAP S/4HANA embedded analytics, which tools are aimed at end users?  Analytical SAP Fiori applications  SAP Smart Business cockpits  Design Studio  Query Designer  Query Browser NO.79 What must you assing for a cross-plant planning scenario? choose 1 answer  the same planner group to multiple maintenance plants  multiple planning plants to a maintenance plant  the same planner group to multiple plants  the same planning plant to multiple maintenance plants NO.80 What is the function of the print diversion setting?  It enables you to chose a printer based on certain fields in the order.  It tells the system that a shop paper for an order is ready to be printed.  It enables you to determine which papers are printed for the technician.  It enables you to define which shop papers are printed as a system default. NO.81 Which edition allows more extensive customer modifications?  Cloud edition  On-premise edition NO.82 Which actions must the engineer perform to serialize piece of equipment? choose 3 answers  assign a serial number profile to the equipment master  add a serilaized material into the construction type field of the equipment master  assign a serial number profile to the material master  add a serial number to an existing equipment master  add a serilaize material to the equipment serial data view NO.83 You have several defective parts that you need to send to a subcontractor to get them refurbished, what must you do to trigger the external refurbishment order? choose 1 answer  creat a manual purchase order and add the refuribshment order number  create an external activity (PM 02) within the refurbishment order  create a manual purchase requistion and add the refurbishment order number  create an internal activity (PM 01) and add the defective mateiral as non stock component NO.84 Why was the application code completely rewritten for SAP S/4HANA?  To take advantage of the simpler data model  SAP S/4HANA is now built with Java  The optimized ABAP code that we developed for Suite on SAP HANA would not work with SAP S/4HANA  To ensure that the code is optimized for SAP HANA NO.85 You create an equipement task list for piece of equipment without BOM assignment. How can you assign component to a task list operation of this equipement taks list? choose 1 answer  – assign the header material of a material BOM as assembly to a task operation– select components from the BOM to the task list operation  – assign the BOM usage for free material assignement in customizing– freely assign material as componenet to the task list operation  – manually assign the BOM usage to a task list header– add component from the BOM to the task list operation  – assign the header material of a mateiral BOM to the equipment taks list header– select compoment from the BOM to the task list operation NO.86 The first release of the SAP Asset Manager Mobile application is based on _______________.  Windows only  iOS, Android and Windows  O Android only  iOS and Android  iOS only NO.87 What characterizes the architecture of a simple application?  Reduction in number of tables  Push data-intensive tasks to SAP HANA  Use of dedicated aggregation tables  No data redundancy  Works with any database NO.88 Two maintenance package of a maintenance strategy are due at the same time. Which parameter determine that only one of these maintenance package is executed? choose 1 answer  hierarchy  package sequence  offset  lead float NO.89 The technical completion of the actual maintenance order was posted with a delay of 10 days. How can the planner shift the next planned date by the same amount? choose 1 answer  set the shift factor for the late completion to 10 %  set the shift factor for late completion 100 %  set the shift factor for early completion 100 %  set the shift factor for early completion 10 % NO.90 In which maintenance object can you use an activity type? choose 2 answer  maintenance order header  task list header  maintenance order operation  work center NO.91 A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.  True  False NO.92 Where can the planner check the material availbility? choose 3 answer  within the SAP fiori-based background job  from the list of orders  within an individual order  within the SAP fiori-based material document overview  from the reservation list NO.93 Which order type do you need when you refurbish defective parts? choose 1 answer  order type with refurbishment indicator  order type breakdown maintenance  order type of pereventive maintenance  order type with investement indicator NO.94 Which periode does the planner define when using the scheduling period in the maintenance plan? choose 1 answer  the period in which the system job for scheduling runs  the period for which orders are created in advance  the period in which a shift of planned dates is allowed  the period for which the system generate planned or call dates NO.95 To which SAP object can the planner assign a maintenance order to make a budget available for the order?choose 2 answers  network header with the allocated budget  investement program item with the allocated budget  functional location with the allocated budget  WBS element with the allocated budget NO.96 The planner add a stock material in the orders. What does the system create reservation depending on the settings of the order type? choose 2 answers  after the available check is performed  when the order is released  when the order is saved  when the cost are determined NO.97 Which of the following is not a Customizing setting for order types?  Structure indicator  Settlement profile  Planning plant  Residence time  Settlement rule NO.98 At what level does the system calculate costs of maintenance orders? choose 1 answer  always on header level depending on the maintenance plant  always on operation level depending on the order type and the maintenance planning plant  on header level or on operation level depending on the order type and the maintenance planning plant  on header level or on operation level depending on the controlling view NO.99 You are planning maintenance execution on the emplyee level. Which combination of SAP objects is mandatory within SAP S/4 HANA? choose 1 answer  SAP user and personnel number  business partenerand personnel number  planner group and personnel number  ogranizational unit and personnel number  Loading … C_TS413_1909 Exam Certification Details: Cut Score:64%Level:AssociateLanguages:German, EnglishDuration:180 mins   C_TS413_1909 Premium Exam Engine pdf Download: https://www.topexamcollection.com/C_TS413_1909-vce-collection.html --------------------------------------------------- Images: https://blog.topexamcollection.com/wp-content/plugins/watu/loading.gif https://blog.topexamcollection.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2022-06-10 17:16:00 Post date GMT: 2022-06-10 17:16:00 Post modified date: 2022-06-10 17:16:00 Post modified date GMT: 2022-06-10 17:16:00