This page was exported from Top Exam Collection [ http://blog.topexamcollection.com ] Export date:Mon Jan 20 23:15:46 2025 / +0000 GMT ___________________________________________________ Title: SAP Certified Application Associate C_TS422_2020 Practice Test Engine Try These 150 Exam Questions [Q75-Q96] --------------------------------------------------- SAP Certified Application Associate C_TS422_2020 Practice Test Engine: Try These 150 Exam Questions Guaranteed Success in SAP Certified Application Associate C_TS422_2020 Exam Dumps Q75. Which transaction code can you use in SAP S/4HANA to enter and display goods movements?  MBO2  MMBE  MIGO  MBNL Q76. In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?  The item category of the component in the BOM  The MRP Type of the component  The Individual/Collective indicator of the component  The Planning Strategy of the finished product Q77. What does it mean for the production planner when MRP works with infinite capacities?  MRP assigns capacity requirements automatically to work center is with the earliest available capacity.  MRP creates capacity requirements without checking the capacity of a work center.  MRP creates capacity requirements only if the work center has sufficient capacity.  MRP assigns capacity requirements automatically after the last scheduled order on a work center. Q78. What are pillars of SAP Activate?There are 2 correct answers to this question.  SAP Best Practices  SAP MaxAttention  Guided Configuration  Premium engagement Q79. What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.  Only the OLAP system has a predefined subset of the data  Multiple copies of the data exist  Batch process are required to keep OLTP and OLAP in sync  The OLAP system needs to write back the data to the OLTP system  Only the OLAP system has the latest data Q80. What are the consequences if operation status Dispatched is set for a production order operation?  You can reschedule the operation using finite Scheduling in a planning board.  You canreschedule the order using material requirements planning.  You can reschedule the operation using lead the scheduling.  You can reschedule the order using lead time scheduling. Q81. Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question.  Order list  Production list  Resource utilization  Resource overview Q82. What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question.  Default values for the item status  Allowed material type  Default unit of measure  Maximum allowed low-level code Q83. You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?There are 2 correct answers to this question.  Bill of material  Work center  Routing header  Material master Q84. Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.  Warehouse number data  MRP area data  Production version data  Storage location data Q85. Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.  Sales order-specific planning run is required.  Sales order-specific stock is created  Net requirements calculation is sales order-specific.  Storage location MRP areas are required.  Production orders are created with sales order reference. Q86. What is a typical transportation processing SAP Transportation Management?  Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting  Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting  Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting  Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting Q87. What are properties of MRP Live? There are 2 correct answers to this question.  It uses the same BAdis as classic MRP  Data is read sequentially from the database tables  The code is written in SQL Script  It is executed on the database server Q88. Which master data object governs the relationship between supply source and demand source in the Kanban process?  Control cycle  Rate routing  Production supply area  Replenishment strategy Q89. What does the industry sector determine? Note: There are 2 correct answers to this question.  Whether a material master fieldis required, changeable, displayed, or hidden  Which transaction you can use to create a new material  Which material master views can be maintained  Whether material numbers are assigned internally or externally Q90. Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.  Change of the material’sprocurement type  Creation of a purchasing contract  Change of the storage bin  Creation of dependent requirements  Creation of a sales order Q91. For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.  The lot size range must be within the lot-size range of the assigned routing.  The assigned routing must be a rate routing.  The deletion flag must NOT be set for the bill of materials (BOM) or the routing.  The assigned routing and bill of materials (BOM) must be valid in the entire validity period.  The assigned routing must NOT have alternative sequences. Q92. Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?  Operation network  Resource network  Work center hierarchy  Setup matrix Q93. You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?  Make-to-order production (20)  Planning without final assembly (50)  Planning with final assembly (40)  Planning at assembly level (70) Q94. What is the purpose of collective orders?  To post production costs ona cost collector instead of the production order  To combine order management of co-products and by-products with the main product  To post any component withdrawals single back flush with order confirmation  To manage production orders for an entirefinished product on multiple levels Q95. Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?  When multiple planned orders exists in one resource  When alternate resourcesare used within one operation  When multiple production versions are maintained for one product  When multiple operations are maintained for one product Q96. What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.  Alternative resources are fully occupied.  The Change Planning Direct on indicator is set.  The work center has several individual capacities.  The planning strategy is infinite.  Loading … SAP C_TS422_2020 Exam Syllabus Topics: TopicDetailsTopic 1Characterize process order elements and process order processing Outline the basics and master data of advanced planningTopic 2Describe the SAP HANA database concept and new user experience with SAP Fiori Explain line load planning and confirmation, outline Kanban master data and Kanban processesTopic 3Outline both motivation and background of SAP S4HANA Detailed scheduling planning board) and advanced planningTopic 4Explain and compare the different production methods in make-to-order Determine BOM item category, describe order status management and set user statusesTopic 5Material Requirements Planning in SAP S4HANA Describe its main components, the lines of business, and the SAP User Experience strategyTopic 6Introduction to SAP S4HANA Supply Chain Planning Identify features for Good Manufacturing Practices (GMP)   Test Engine to Practice C_TS422_2020 Test Questions: https://www.topexamcollection.com/C_TS422_2020-vce-collection.html --------------------------------------------------- Images: https://blog.topexamcollection.com/wp-content/plugins/watu/loading.gif https://blog.topexamcollection.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2022-11-18 14:45:03 Post date GMT: 2022-11-18 14:45:03 Post modified date: 2022-11-18 14:45:03 Post modified date GMT: 2022-11-18 14:45:03