This page was exported from Top Exam Collection [ http://blog.topexamcollection.com ] Export date:Sun Jan 19 3:32:36 2025 / +0000 GMT ___________________________________________________ Title: New SAP C-TS422-2020 Dumps & Questions Updated on 2022 [Q36-Q55] --------------------------------------------------- New SAP C-TS422-2020 Dumps & Questions Updated on 2022 Dumps to Pass your C-TS422-2020 Exam with 100% Real Questions and Answers SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics: Topic AreasTopic Details, Courses, BooksWeightingMaster Data in SAP S/4HANAIdentify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020)ORS4210 (SAP S/4HANA 2020)> 12%Production Orders in SAP S/4HANADetermine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020)ORS4225 (SAP S/4HANA 2020)> 12%Material Requirements Planning in SAP S/4HANASelect and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. TS421, TS422 (SAP S/4HANA 2020)ORS4220 (SAP S/4HANA 2020)8% - 12%Demand Management in SAP S/4HANAExplain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020)ORS4220 (SAP S/4HANA 2020)< 8%Introduction to SAP S/4HANA Supply Chain PlanningOutline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. TS421, TS422 (SAP S/4HANA 2020)ORS4200 (SAP S/4HANA 2020)< 8%Lean Manufacturing in SAP S/4HANAIdentify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020)ORS4200 (SAP S/4HANA 2020)8% - 12%Process Orders in SAP S/4HANACharacterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). TS421, TS422 (SAP S/4HANA 2020)ORS4200 (SAP S/4HANA 2020)< 8%   NO.36 What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.  Monitor Production Orders Fiori app  Lock-free inventory movements  Flow manufacturing  Material Coverage Fiori app  Rough-cut capacity planning NO.37 You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?  The new operation is inserted at the desired time; the previously dispatched operation is moved forward.  The new operation is inserted at the desired time the previously dispatched operation is moved backward.  The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.  The previously dispatched operation stays assist the new operation is inserted before the dispatched operation. NO.38 Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.  Archiving of documents for assembly scrap  Reduction of associated capacity requirements  Posting of goods receipt for the product  Posting of production costs to the production cost collector  Material staging for next order in sequence NO.39 In which data objects do you maintain the production line as the work center forrepetitive manufacturing?Note: There are 2 correct answers to this question.  Production version  Production cost collector  Routing  Repetitive manufacturing profile NO.40 You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?  When you create a sales order  When you deliver a sales order  When the MRP results are saved  When you create a planned order NO.41 You are creating a production order manually. What activities are involved in this process?There are 3 correct answers to this question.  Planning selection  Order type determination  Actual cost calculation  Capacity requirements determination  Master data selection NO.42 Where can you find the latest in version of the Simplification List for SAP S/4HANA?Please choose the correct answer.  SAP Solution Manager 7.2  SAP Help Portal  SAP Support Portal  SAP Best Practices Explorer NO.43 What is the purpose of collective orders?  To post production costs ona cost collector instead of the production order  To combine order management of co-products and by-products with the main product  To post any component withdrawals single back flush with order confirmation  To manage production orders for an entirefinished product on multiple levels NO.44 What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.  Multid imensional Reporting client (MDRC)  Smart Business Cockpit  HANA Live  ABAP Managed Core Data Services (CDS) NO.45 A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?  Infinite resource and infinite strategy  Finite resource and finite strategy  Finite resource and infinite strategy  Infinite resource and finite strategy NO.46 For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.  The lot size range must be within the lot-size range of the assigned routing.  The assigned routing must be a rate routing.  The deletion flag must NOT be set for the bill of materials (BOM) or the routing.  The assigned routing and bill of materials (BOM) must be valid in the entire validity period.  The assigned routing must NOT have alternative sequences. NO.47 You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.  /SAPAPO/UPD_LOC_SP_PL  /SAPAPO/CURTO_CREATE  /SAPAPO/PPDS_DELTA_ORD_TRANS  /SAPAPO/CREATE_LOCATION NO.48 Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?  Make-to-stock production (10)  Planning without final assembly (50)  Make-to-order production (20)  Planning with final assembly (40) NO.49 Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.  Sales order-specific planning run is required.  Sales order-specific stock is created  Net requirements calculation is sales order-specific.  Storage location MRP areas are required.  Production orders are created with sales order reference. NO.50 Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.  Queue time  Float before production  Pick/pack time  Wait time  Move time NO.51 For which planning-relevant data objects do you set just one indicator to include then in PP/DS?There are 2 correct answers to this question.  Plant  Material  Work center  Production version NO.52 What are properties of MRP Live? There are 2 correct answers to this question.  It uses the same BAdis as classic MRP  Data is read sequentially from the database tables  The code is written in SQL Script  It is executed on the database server NO.53 What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.  Comparison of current data with historical data to identify trends  Automatic update of story boards  Strategic analysis  Real time decision support NO.54 What does a line hierarchy in repetitive manufacturing represent?  A production line with a parallel sequence in the routing  A production line with an alternative sequence in the routing  A production line with prioritized alternative work centers  A production line with more than one work center NO.55 Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question.  Order list  Production list  Resource utilization  Resource overview  Loading … Updated Exam C-TS422-2020 Dumps with New Questions: https://www.topexamcollection.com/C-TS422-2020-vce-collection.html --------------------------------------------------- Images: https://blog.topexamcollection.com/wp-content/plugins/watu/loading.gif https://blog.topexamcollection.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2022-12-12 12:08:15 Post date GMT: 2022-12-12 12:08:15 Post modified date: 2022-12-12 12:08:15 Post modified date GMT: 2022-12-12 12:08:15