TopExamCollection 1Z0-902 Dumps PDF – 100% Passing Guarantee [Q25-Q47]

October 29, 2023 0 Comments

Rate this post

TopExamCollection 1Z0-902 Dumps PDF – 100% Passing Guarantee

1Z0-902 Braindumps Real Exam Updated on Oct 29, 2023 with 60 Questions

QUESTION 25
You are updating your Exadata X9M-2 Elastic Database Machine with 6 database servers and 12 High Capacity Storage Servers. You will be using patchmgr to apply updates across the entire machine while still maintaining database availability.
Assuming you are driving patchmgr from an external server, which statement is true about the execution phase?

 
 
 
 

QUESTION 26
Your customer needs to ensure that their data is available on the Exadata machine during updates. The customer wants to be able to update one server at a time but still be protected against single-node server failure.
What ASM redundancy level should they use?

 
 
 
 
 

QUESTION 27
You are providing oversight for the delivery of a new Exadata Database Machine.
1. Stabilize the Exadata Rack.
2. Unpack Oracle Exadata Rack.
3. Review the safety guidelines.
4. Let the Exadata acclimatize for 24 hours.
5. Power on Exadata PDU A.
6. Place Exadata in its allocated space.
7. Power on Exadata PDU B.
What is the correct order of these steps?

 
 
 
 
 

QUESTION 28
Examine this list of software components:
1. Oracle KVM Guest
2. Oracle Enterprise Manager Agent (OMA)
3. ASM instance
4. RDBMS instance
5. Automatic Diagnostic Repository Command Interpreter (ADRCI)
6. CELLCLI
7. Cell Server(CELLSRV)
8. diskmon
9. Restart Server (RS)
10. Management Server (MS)
What is the correct location where these software components can run in the standard Exadata Database Machine deployment?

 
 
 
 
 

QUESTION 29
For which four component failures on an X9M Database Machine does Auto Service Request (ASR) raise service requests?

 
 
 
 
 
 
 

QUESTION 30
Which are two correct statements for managing virtual deployment using Oracle Exadata Deployment Assistant (OEDA)?

 
 
 
 

QUESTION 31
Which two statements are true about the initial storage configuration after the standard (non-virtualized) deployment of a new Exadata Database Machine with High Capacity storage servers?

 
 
 
 
 

QUESTION 32
Which are two correct statements about backing up Exadata Database Machine?

 
 
 
 
 

QUESTION 33
Which statement is true about the Persistent Memory Commit Accelerator?

 
 
 
 
 

QUESTION 34
Which are two correct statements about backing up Exadata Database Machine?

 
 
 
 
 

QUESTION 35
Which two statements are correct about adding an additional database server to a physical Exadata X9M Database Machine using Oracle Exadata Deployment Assistant (OEDA)?

 
 
 
 
 

QUESTION 36
Which two statements are true about applying updates on Exadata systems?

 
 
 
 
 
 

QUESTION 37
Which two quarantine types can disable Smart Scan for multiple databases that offload SQL statements to a cell on an Exadata Database Machine?

 
 
 
 
 

QUESTION 38
You have been notified by your Network Administrator that an upstream switch has been replaced due to a hardware fault. Which command verifies that the client network on your Exadata X9M-2 Database Server is available via both client switches?

 
 
 
 

QUESTION 39
You use Enterprise Manager to monitor all the components of your Exadata Database Machine.
Recently, you discovered that certain asmdisks were offline in one of the diskgroups used by the rac database called prod.
In which two sources would you find diagnostic messages related to this problem?

 
 
 
 
 

QUESTION 40
You are hardening the security posture of your Exadata Database Machine. Before disabling ssh access to the storage servers, what should you do to enable REST access to the MS process?

 
 
 
 

QUESTION 41
You want to monitor how a large production table is accessed. Especially, you are interested to see how the access on that particular table leverages the benefits of the Exadata Platform.
Which two actions are NOT appropriate for that purpose?

 
 
 
 

QUESTION 42
You want to monitor how a large production table is accessed. Especially, you are interested to see how the access on that particular table leverages the benefits of the Exadata Platform.
Which two actions are NOT appropriate for that purpose?

 
 
 
 

QUESTION 43
Which of the following is NOT a requirement when validating, receiving, unpacking, and planning access route and space requirements for Exadata Database Machine?

 
 
 
 
 
 

QUESTION 44
You have been notified by your Network Administrator that an upstream switch has been replaced due to a hardware fault. Which command verifies that the client network on your Exadata X9M-2 Database Server is available via both client switches?

 
 
 
 

QUESTION 45
You have been tasked with replacing a memory module of an Exadata Storage Server and need to power off the affected storage server. Which two commands must you execute to safely power off the storage server in an Exadata X9M Database Machine?

 
 
 
 
 
 

QUESTION 46
What is the maximum DRAM capacity you can expand an X9M-2 DB Server?

 
 
 
 
 
 

QUESTION 47
Which four actions should you take before proceeding with applying updates to your Exadata Database Machine?

 
 
 
 
 
 

To prepare for the Oracle 1z1-902 exam, candidates should have a good understanding of Oracle Exadata Database Machine X8M architecture and its components, such as database servers, storage servers, and InfiniBand switches. They should also have knowledge of Oracle database administration and management, including backup and recovery, performance tuning, and security. Candidates should also have experience in installing and configuring Exadata Database Machine X8M and be familiar with the tools and techniques used for troubleshooting common issues.

 

1Z0-902 Dumps With 100% Verified Q&As – Pass Guarantee or Full Refund: https://www.topexamcollection.com/1Z0-902-vce-collection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below