100% CPIM試験のトップセラーの合格 - 新2023年APICSプラクティス試験[Q188-Q209]。

8月 27, 2023 0 コメント

この記事を評価する

100% Pass Top-selling CPIM Exams – New 2023 APICS Pratice Exam

APICS Certification Dumps CPIM Exam for Full Questions – Exam Study Guide

質問188
Which of the following are the types of sourcing?

 
 
 
 

質問189
Which of the following is/are included in five major levels in the manufacturing planning and control system?

 
 
 
 

質問190
To satisfy the financial auditors that the inventory records represent the value of the inventory, this is the purpose of:

 
 
 
 

質問191
If the efficiency of the work center in the above question is 115%. What is the rated capacity of the work center?

 
 
 
 

質問192
This figure is a true representation of:

 
 
 
 

質問193
The place where goods are stored for long periods and where the prime purpose is to protect goods until they are needed id called

 
 
 
 

質問 194
There is difference between measurement and standards, because:

 
 
 
 

質問195
A graph of the number of times (frequency) actual demand is of a particular value produces a bell-shaped curve, this distribution is called:

 
 
 
 

質問196
Which function is to determine the need for labor, equipment, and material to meet the priority plans?

 
 
 
 

質問197
Which of the following help to achieve marketing objectives?

 
 
 
 

質問 198
is a two-step process. First determine the time needed for each order at each order at each work center. Then sum up the capacity required for individual orders?

 
 
 
 

質問199
is responsible for producing a set of specifications that manufacturing can use to make the product. Products must be designed to be:
* Functional
* Capable of low-cost processing

 
 
 
 

質問200
Which of the following are the major objectives of Material Requirement Planning?

 
 
 
 

質問 201
At the MRP planning level, the process of priority plans must be checked against available capacity is called

 
 
 
 

質問202
A forecast is typically more accurate for:

 
 
 
 

質問203
The service level is directly related to the number of standard deviations provided as safety stock and is usually called:

 
 
 
 

質問204
The MPS is a plan for manufacturing; it reflects the needs of the marketplace and the capacity of manufacturing and forms a priority plan for manufacturing to follows: The MPS forms a vital link between sales and production as follows:

 
 
 
 

質問205
Following is an example of:

 
 
 
 

QUESTION 206
Where-used reports give information about

 
 
 
 

QUESTION 207
Engineering drawings and specifications and bill of material are the methods of:

 
 
 
 

QUESTION 208
The percentage of time that the work center is active compared to the available time is called:

 
 
 
 

QUESTION 209
What are usually stated in units of product or some standard unit of output?

 
 
 
 