[Q29-Q53] 1z0-1075-24 by Oracle Actual Free Exam Questions And Answers [UPDATED 2025]

3월 9, 2025 0 댓글

이 게시물 평가하기

1z0-1075-24 by Oracle Actual Free Exam Questions And Answers [UPDATED 2025]

1z0-1075-24 Questions Truly Valid For Your Oracle Exam!

Oracle 1z0-1075-24 Exam Syllabus Topics:

주제 세부 정보
주제 1
  • Managing Work Orders: This portion of the exam evaluates the skills of production and manufacturing managers, emphasizing the functionalities within the Work Execution Work Areas. It includes creating and modifying work orders for both standard and non-standard manufacturing, with serialized production included.
주제 2
  • Integrating Manufacturing Modules: This section is designed for manufacturing integration specialists and highlights the essential features of Manufacturing Cloud integrations. It examines how various manufacturing modules interact and integrate within a cloud environment, ensuring smooth operations and seamless data flow across systems.
주제 3
  • Setting up Manufacturing Elements: This part of the exam assesses the expertise of manufacturing professionals and focuses on the core functionalities of Functional Setup Manager and Simplified Setup. It includes configuring common elements, resources, operations, and work centers, as well as setting plant parameters and managing security.
주제 4
  • Managing Projects Enabled SCM: This part of the exam evaluates the competencies of project managers in supply chain management and covers essential projects-enabled SCM configurations. It involves managing project-enabled work orders, which is crucial for aligning project management with manufacturing and supply chain processes.
주제 5
  • Executing Production: This section measures the proficiency of production managers in key aspects of production execution, including outside processing. It covers identifying functions in the dispatch list, reporting production and orderless transactions, and reviewing production transactions and product genealogy.

 

질문 29
To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.
Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

 
 
 
 
 

질문 30
Your client’s company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.
You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.
Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?

 
 
 
 

질문 31
A Manufacturing Engineer in a plant is creating an alternate manufacturing process for an item using its existing work definitions. After copying from the existing work definition, WD1, to the alternate work definition, WD2, the engineer finds that the operation items were not copied in the alternate manufacturing process WD2.
그 이유는 무엇인가요?

 
 
 
 

질문 32
Which three requirements are fulfilled by nonstandard work orders?

 
 
 
 

질문 33
You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.
Which setup task must you perform in the Manage Plant Parameters section to achieve this?

 
 
 
 

질문 34
A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?

 
 
 
 

질문 35
Which three entities must you set up in Oracle Manufacturing Cloud to create a work definition for an item that will be manufactured in-house?

 
 
 
 
 

질문 36
The pick release of a project work order creates movement requests with the project and the task from the work order.
Which statement is NOT true about this?

 
 
 
 

질문 37
Which three statements are true about the main areas of Managerial Accounting?

 
 
 
 

질문 38
Your client informs you that after running the “Process Item Structure Changes to Work Definitions” scheduled process, they received a workflow notification.
Which statement is NOT a workflow notification that you might get if automation is not performed?

 
 
 
 

질문 39
A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2 available for day and night shift.
What is the correct sequence of steps to achieve this?

 
 
 
 

질문 40
Your client is planning to override the Plant Production Calendar with One or More Date-Effective Work Center Calendars. You need to explain the consideration when using the Override the Plant Production Calendar with One or More Date-Effective Work Center Calendars feature.
Which three statements are true when overriding the production calendar?

 
 
 
 
 

질문 41
Which two reports provide work order cost-related information to Costing users?

 
 
 
 

질문 42
Which three types of item quantities are displayed on the Work Order History tab?

 
 
 
 
 

질문 43
Which statement is NOT true about the Reservations tab?

 
 
 
 
 

질문 44
A Production Operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?

 
 
 
 

질문 45
In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
그 이유는 무엇인가요?

 
 
 
 

질문 46
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.
Which seeded job role must you assign to this employee?

 
 
 
 
 

질문 47
Two work definitions are created in the application: one for Engine Finished Good and the other for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Good as one of its components.
How can you establish the relationship between the Pallet and Engine work definitions?

 
 
 
 

질문 48
Your client has asked you to implement the functionality to ensure that the system checks for Qualified Operators when reporting labor usage.
Which statement is NOT true?

 
 
 
 

질문 49
Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?

 
 
 
 
 

검증된 정답이 포함된 100% 실제 시험 문제에 즉시 액세스하세요: https://www.topexamcollection.com/1z0-1075-24-vce-collection.html

         

답글 남기기

이메일 주소는 공개되지 않습니다. 필수 필드는 *로 표시됩니다

아래 이미지에서 텍스트를 입력합니다.