SAP E-S4HCON2023 Dumps – The Sure Way To Pass Exam [Q45-Q63]

8 月 19, 2023 0 条评论

4.6/5 - (15 选票)

SAP E-S4HCON2023 Dumps – The Sure Way To Pass Exam

E-S4HCON2023 Exam Questions (Updated 2023) 100% Real Question Answers

问题 45
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?

 
 
 
 

问题 46
You want to execute a Unicode Conversion only. Which approach do you need to follow?
请选择正确答案。
回应:

 
 
 
 

问题 47
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
本题有 2 个正确答案。
回应:

 
 
 
 

问题 48
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

 
 
 
 

问题 49
您正在升级 DEV - QAS - PRD 三个系统。升级项目包含 Unicode 转换。您已经升级了 DEV 和 QAS 系统,但尚未升级 PRD 系统。您需要考虑哪些问题?请选择正确答案。

 
 
 
 

问题 50
您想通过 ABAP 测试驾驶舱执行自定义代码检查,为 SAP S/4HANA 转换做准备?您可以使用哪种 SAP 系统来生成自定义代码迁移工作表?

 
 
 

问题 51
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

 
 
 
 

问题 52
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

 
 
 
 

问题 53
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
本题有 2 个正确答案。

 
 
 
 

问题 54
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step “Extraction”.
Where can you change this during the migration via the Utilities option of the SUM UI?
本题有 2 个正确答案
回应:

 
 
 
 

问题 55
您使用的是 SUM 的 DMO。您定义了正常运行时 40 个并行 R3load 进程和停机时 80 个并行 R3load 进程。
服务器提供 8 个 CPU 内核。阶段 EU_CLONE_MIG_DT_RUN 正在运行。在图表控制中心,可以看到 40 个进程桶正在并行执行。
为什么要并行执行 40 个进程桶?
请选择正确答案。
回应:

 
 
 
 

问题 56
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
本题有 3 个正确答案。
回应:

 
 
 
 
 

问题 57
您正在 SAP MaxDB 上运行一个 SAP ECC 系统,该系统采用 SAP_BASIS 740 非统一编码。以下哪些是执行 SAP S/4HANA 转换的可能路径?注意:本问题有 3 个正确答案。

 
 
 
 
 

问题 58
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

 
 
 
 

问题 59
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

 
 
 
 
 

问题 60
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

 
 
 
 

问题 61
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

 
 
 
 

问题 62
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
本题有 2 个正确答案。
回应:

 
 
 
 

问题 63
在哪些情况下,SUM 可以在不创建影子系统的情况下运行?
请选择正确答案。
回应:

 
 
 
 

Pass SAP E-S4HCON2023 Exam Quickly With TopExamCollection: https://www.topexamcollection.com/E-S4HCON2023-vce-collection.html

         

發佈留言

發佈留言必須填寫的電子郵件地址不會公開。 必填欄位標示為 *

输入下图中的文字