QUESTION 188
Which of the following are the types of sourcing?

 
 
 
 

QUESTION 189
Which of the following is/are included in five major levels in the manufacturing planning and control system?

 
 
 
 

QUESTION 190
To satisfy the financial auditors that the inventory records represent the value of the inventory, this is the purpose of:

 
 
 
 

QUESTION 191
If the efficiency of the work center in the above question is 115%. What is the rated capacity of the work center?

 
 
 
 

QUESTION 192
This figure is a true representation of:

 
 
 
 

QUESTION 193
The place where goods are stored for long periods and where the prime purpose is to protect goods until they are needed id called

 
 
 
 

QUESTION 194
There is difference between measurement and standards, because:

 
 
 
 

QUESTION 195
A graph of the number of times (frequency) actual demand is of a particular value produces a bell-shaped curve, this distribution is called:

 
 
 
 

QUESTION 196
Which function is to determine the need for labor, equipment, and material to meet the priority plans?

 
 
 
 

QUESTION 197
Which of the following help to achieve marketing objectives?

 
 
 
 

QUESTION 198
is a two-step process. First determine the time needed for each order at each order at each work center. Then sum up the capacity required for individual orders?

 
 
 
 

QUESTION 199
is responsible for producing a set of specifications that manufacturing can use to make the product. Products must be designed to be:
* Functional
* Capable of low-cost processing

 
 
 
 

QUESTION 200
Which of the following are the major objectives of Material Requirement Planning?

 
 
 
 

QUESTION 201
At the MRP planning level, the process of priority plans must be checked against available capacity is called

 
 
 
 

QUESTION 202
A forecast is typically more accurate for:

 
 
 
 

QUESTION 203
The service level is directly related to the number of standard deviations provided as safety stock and is usually called:

 
 
 
 

QUESTION 204
The MPS is a plan for manufacturing; it reflects the needs of the marketplace and the capacity of manufacturing and forms a priority plan for manufacturing to follows: The MPS forms a vital link between sales and production as follows:

 
 
 
 

QUESTION 205
Following is an example of:

 
 
 
 

QUESTION 206
Where-used reports give information about

 
 
 
 

QUESTION 207
Engineering drawings and specifications and bill of material are the methods of:

 
 
 
 

QUESTION 208
The percentage of time that the work center is active compared to the available time is called:

 
 
 
 

QUESTION 209
What are usually stated in units of product or some standard unit of output?

 
 
 
 

Authentic Best resources for CPIM Online Practice Exam: https://www.topexamcollection.com/CPIM-vce-collection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below