SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:

Topic Areas Topic Details, Courses, Books Weighting
Master Data in SAP S/4HANA Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4210 (SAP S/4HANA 2020)

> 12%
Production Orders in SAP S/4HANA Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4225 (SAP S/4HANA 2020)

> 12%
Material Requirements Planning in SAP S/4HANA Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

8% – 12%
Demand Management in SAP S/4HANA Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Introduction to SAP S/4HANA Supply Chain Planning Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Lean Manufacturing in SAP S/4HANA Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

8% – 12%
Process Orders in SAP S/4HANA Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%

 

NO.36 What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.

 
 
 
 
 

NO.37 You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

 
 
 
 

NO.38 Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.

 
 
 
 
 

NO.39 In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.40 You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

 
 
 
 

NO.41 You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.

 
 
 
 
 

NO.42 Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.

 
 
 
 

NO.43 What is the purpose of collective orders?

 
 
 
 

NO.44 What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.

 
 
 
 

NO.45 A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

 
 
 
 

NO.46 For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.47 You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.

 
 
 
 

NO.48 Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

 
 
 
 

NO.49 Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.50 Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.51 For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.

 
 
 
 

NO.52 What are properties of MRP Live? There are 2 correct answers to this question.

 
 
 
 

NO.53 What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.

 
 
 
 

NO.54 What does a line hierarchy in repetitive manufacturing represent?

 
 
 
 

NO.55 Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question.

 
 
 
 

Updated Exam C-TS422-2020 Dumps with New Questions: https://www.topexamcollection.com/C-TS422-2020-vce-collection.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below